Submission of Application

The applicants are required to refer to the Guide to Application ("the Guide") and Application Forms below for details about submission of application. Applications for grants under FAS could be submitted in any time commencing from 28 August 2008. Submission of application received on or after 1 April 2015 is divided into two stages. The first stage is Approval-in-principle of the application and the second stage is Technical Assessment on detailed submission of the proposal. The applicant must first read the Guide carefully and fully understand its content before completing the application form. The key points on the submission of application are set out as follows:

Stage 1 - Approval-in-Principle

Stage 2 - Technical Assessment & Formal Approval

Description File Download
Guide to Application PDF
i. For privately-owned graded historic buildings:
Application Form (Form 1) DOC
Technical Assessment Form (Form 2) DOC
ii. For government-owned declared monuments or graded historic buildings leased to NPOs:
Application Form (Form 1a) DOC
Technical Assessment Form (Form 2a) DOC

Enquiries

For enquiries, please contact:

Address: Commissioner for Heritage's Office, Development Bureau,
Unit 701B, 7/F, Empire Centre, 68 Mody Road,
Tsim Sha Tsui East, Kowloon,
Hong Kong
Email: mhb_enquiry@devb.gov.hk
Phone: 2906 1539
Fax: 2906 1574